E-mail: info@lots-ship.co.ke | Call: : +254 726 105003 | Country : Kenya  

Project Activities

Some critical milestones in Project activities:


>The company lightened a gearless Panamax at Cochin outer anchorage, through a never-before kind of project execution. The company’s logistics and technical acumen enhanced time and cost efficiency of the entire project, setting a new benchmark in the industry.


>The company provided total logistics solutions for Kochi Refineries’ Single Point Mooring facility of Bharat Petroleum Corporation Limited (BPCL).  For this project, LOTS transported 40,000 MT of 48” dia pipes from Mundra to Cochin, facilitated storage and transportation to offshore locations for sub-sea laying  -  a feat accomplished in record time of 90 days.


>When BPCL wanted to transport a mammoth 800-tonneReactor to its refinery off Kochi Port, the company preferred the expertise of LOTS. To transport this biggest ever single piece of machinery handled in the country through inland waterways, LOTS designed and built a special barge in a record time, at its own ship-building facility, the Master Shipyard Ltd.


>When DP World wanted to move their Gottwald Cranes without dismantling them to their new facilities at Vallarpadom from Willingdon Island, they turned to LOTS Shipping Limited who picked up the challenge and delivered at very competitive costs.


>The unloading arms for an LNG Terminal were a very critical piece of equipment.  When CINDA, the EPC contractor to Petronet LNG, tried several means to install the unloading arms at the Puthuvypeen LNG Terminal and failed, LOTS Shipping Limited stepped in with an innovative solution and solved the problem which, over a period, appeared insoluble.

 

2017 All Rights Reserved | LOTS Shipping East Africa Ltd.